:
Natalia is a Futanari who was deeply dissatisfied with her monotonous and exhausting job, where she is constantly harassed by her authoritarian boss. However, after joining a group of local activists, her life changes considerably. These agitators call themselves “The Fisterhood”, a mysterious NGO that advocates for Futanari people and that fights against tyranny. And they also seem to have an obsession with impregnating and dominating women until they turn into submissive fucktoys. Will our protagonist finally find a place where she belongs after joining their ranks?
Thread Updated:: 2021-07-01
Release Date: 2021-07-01
Developer: MrKhing – –
Censored: No
Version: 1.0
OS: Windows, Linux, Mac, Android
Language: English
Genre:
Futanary, Futanari Protagonist, Futadom, Impregnation, Pregnancy, Vaginal Sex, Creampie, Public use, Humiliation, Netori, Corruption, Mind Control, Glory Hole, Rape
Installation:
Extract and run.
Changelog:
v1.0:
Full release: 8 epilogues/endings added.
New animations, images and music.
A lot of typos have been corrected.
General improvements in the code.
v0.5a:
New chapter added to the story with new images, animations and sound.
Replaced placeholder font.
Fixed some errors and typos in the script.
Optimized android version to reduce bloated file size.
v0.4:
2 new chapters added to the story with new images, animations, sounds and music.
Some improvements to the sound effects of a sex scene in chapter 1.
Fixed some character portrait issues.
v0.3:
2 brand new chapters added to the story
New CGs, sprites, animations and music.
v0.2:
New art style.
All character sprites in the game have been replaced.
Save Games not compatible with the previous version.
v0.1:
Initial Release
Developer Notes:
This is an erotic visual novel that focuses heavily on Futanari, Futadom, and Pregnancy. It also features animated sex scenes and an original soundtrack. Most of the content is futa-on-girl but some futa-on-futa is available. There is some Netori content in this game (the protagonist has intercourse with married women).
Win/Linux: – – –
Mac: – –
Android: – – –
Extras: *





